AVAdek| 45,000 SF | Webster, TX

1.04.18 - Crewmen began installing the trim, gutters, and downspouts,

 AVAdek1.04.18 22

AVAdek1.04.18 2

AVAdek1.04.18 8

AVAdek1.04.18 9

AVAdek1.04.18 17

11.21.17 - Progress handing steel,

IMG 7886

IMG 7881

IMG 7876

 

 

11.14.17 - Hanging tilt-wall panels,

avadek11.14.17

avadek11.14.17 2